Element
X12 EDI Release 00403
V9
304Event Code
Code identifying the event about which a report is made
属性
数据类型ID
必须?Mandatory
Codes (108)
  • AAARequested Requirements
  • AADActual Arrival at POD
  • ACAActual Conveyance Arrival
  • ACCAccepted
  • ADRHighway Departure
  • ALRActually Loaded on Rail
  • ALVActually Loaded on Vessel
  • ANOArrived, Not Ordered Placed by Destination Party
  • APUAnticipated Pickup
  • ARDActual Arrival Date at Final Destination
  • ARIArrival Transit Location
  • ARRArrival Final Destination
  • ASOAnticipated Set-out
  • BADBad Order
  • BFRRelease from Bad Order
  • BHVBad Order Heavy Repair
  • BLGBad Order Light Repair
  • BOHBad Order - Hours to Repair
  • CCTCrew Call
  • CG1Car Grade By Inspection
  • COCCancellation of Conveyance
  • CRDCargo Receipt Date
  • CSLCargo Stripping
  • CTUCrew Tie Up
  • DDLDelivery Attempt
  • DECDeclined
  • DELDeleted
  • DEPDelivery Pending
  • DFLDeparture from Location
  • DRMDeramped
  • DSIDestination Switch Interchange
  • EADEstimated Arrival Date
  • EDDEstimated Departure Date
  • EFTEstimated Free Time
  • ERDEstimated Arrival Date at Final Destination
  • ETAAdvanced Estimated Time of Arrival
  • EWIEarly Warning Inspections
  • EWLAssociation of American Railroads Early Warning Letter
  • FOLFollow Up
  • FTEFree Time Expired Date
  • HARHighway Arrival RR Facility
  • HMIHold or Miscellaneous
  • HRERelease from Hold or Miscellaneous
  • IBDIn Bond
  • ICHInterchange Delivery
  • ICRInterchange Receipt
  • IGTIntermodal In-Gate Arrival at Railroad Intermodal Terminal
  • INCIncomplete
  • INVAssociation of American Railroads Inventory Move
  • IRDIn Transit
  • IRIIngate to Rail Interchange
  • ITSIngate to Rail Terminal or Satellite
  • MALMailed
  • MWYMove Away
  • NOBNo Bill at Location
  • NOTNotified Destination Party
  • OCAOverdue Conveyance Arrival
  • OGTIntermodal Out-Gate
  • OIDOpen Interchange Delivery
  • OIROpen Interchange Receipt
  • ORIOutgate to Rail Interchange
  • OSIOrigin Switch Interchange
  • OTSOutgate to Rail Terminal or Satellite
  • PACPlacement Actual
  • PCOPlacement Constructive
  • PENPending
  • PFPPulled from Patron
  • POSPostpone
  • PRBProblem Log Created
  • RAMRamped
  • RECPostal Reconsignment
  • REJRejected by Shipper
  • REPRepended
  • RETReceipted
  • RLOReleased Loaded from Customer
  • RMTReleased Empty from Customer
  • RYDRail Yard Move
  • SADScheduled Arrival Date
  • SATSatisfied
  • SDDScheduled Departure Date
  • SLDSailed
  • SPDScheduled Passing
  • SPTSpot Date
  • STATo Storage - Actual
  • STITo Storage - Intend
  • STNStored Unserviceable
  • STPStored Prospective Load
  • STSStored for Seasonal Use
  • STUStored Serviceable
  • SUSSuspended
  • TDLTrain Delay
  • TMATrain Move Arrival
  • TMDTrain Move Departure
  • TODTrain Overdue
  • TPLTrip Planned
  • TRNLading Transferred
  • TRPTrain Reported Passing
  • UFVUnloaded From Vessel
  • UNSUnable to Schedule
  • VARVessel Arrival
  • VDPVessel Departure
  • WAIWaived
  • WGHWeigh
  • WITWithdrawn
  • WYBWaybilled
  • ZZXRefuel
  • ZZYFuel Reading
  • ZZZMutually Defined